For FMCG & Consumer Goods Plants

    Micro-Stops Steal Hours You Never See. Find Them. Fix Them.

    Fillers, cappers, labellers and case packers run hundreds of units a minute. Short stops, slow changeovers and sudden motor failures quietly take 10–20% of your capacity. We make those losses visible, predict failures, and train crews to change over faster.

    High-speed FMCG packaging line with bottles and cartons on conveyors

    The Problems Eating Your Margin

    Every fmcg manufacturing plant we visit fights the same three battles.

    Invisible Micro-Stops

    Jams and short stops of a few seconds never reach the downtime log — but across a shift they add up to hours of lost output.

    Slow, Inconsistent Changeovers

    SKU proliferation means more changeovers. Each crew does it differently, and every extra minute is lost capacity.

    Sudden Drive & Gearbox Failures

    A failed conveyor gearbox or filler drive stops the line mid-promotion — exactly when demand is highest.

    FMCG margins are won on line efficiency. The plants that win measure every second and fix the biggest losses first.

    40%
    Less Unplanned Downtime
    25-40%
    OEE Improvement
    75%
    Faster Crew Training
    <1 Year
    Typical Payback

    How We Fix It

    Problem first, outcome second, technology last. Here is what delivers the result.

    Predictive Maintenance for High-Speed Lines

    Sensors on fillers, cappers, conveyors and case packers detect bearing and drive wear early, so maintenance fits into planned changeovers.

    See Predictive Maintenance

    Faster, Standardised Changeovers

    Crews rehearse changeover and SMED sequences in VR so every shift performs them the same way — faster and with fewer start-up rejects.

    See VR Training

    Make Hidden Losses Visible

    An AI co-pilot ranks micro-stops, speed losses and changeover delays by cost — and simulates the improvement before you change the line.

    See AI Process Optimisation
    No upfront hardware costWorks on legacy machines2-minute sensor installLive in weeks, not months

    Questions FMCG Manufacturing Teams Ask Us

    One all-inclusive yearly subscription covering sensors, AI platform and support. Most plants see payback within 12 months.

    See What Downtime Costs Your Plant

    Book a free 30-minute assessment. We will quantify your downtime cost, identify your highest-risk assets, and show you the payback before you commit to anything.

    WhatsApp