What is unplanned downtime actually costing you?
Every stopped line has a price: lost output, emergency repairs, overtime, scrapped work-in-progress and the order that shipped late. Put your own figures in below and you will have the annual cost, the share that is realistically recoverable, and the payback period — before you talk to anyone.
Downtime & payback calculator
Your numbers, with sources
Start from a sector preset, replace it with your own figures, and see the full yearly cost, the part early warning can realistically prevent, and how fast monitoring pays back.
Your plant
Spindles, compressors and humidification fans fail gradually.
Large plants average ~27 h/month (Siemens 2024). Count every unplanned stop, including short ones.
Margin on the output you could not make or ship in that hour.
Costs on top of lost output. Pharma and food are usually highest because of batch loss.
Reduction of equipment-caused stops. McKinsey reports 30–50% for mature programmes.
What it adds up to
Yearly cost of unplanned downtime
€750,000
- Lost output (240 h × €2,500)
- €600,000
- Repairs, scrap, overtime
- +€150,000
Only 70% of downtime in this sector comes from gradually failing equipment; the rest (materials, changeovers, operators) is not counted.
Recoverable each year
€215,000
67 production hours back
Net return
1333%
Payback
0.8 months
Indicative estimate. Sector presets are conservative mid-size-plant figures; currency rates are approximate. Sources:
How to read your result
The annual cost is the honest baseline
It is what doing nothing costs over twelve months. If it is larger than one engineer's salary, the problem is a budget line, not a nuisance.
Only part of it is recoverable
Failures that develop gradually on rotating equipment can be caught early. Material shortages, changeovers and planned work cannot — the calculator assumes the former only.
Payback is the deciding number
Compare the months shown against your own approval threshold. If it clears, the rest of the conversation is about which assets to instrument first.
Questions plant managers ask
How do I calculate the cost of unplanned downtime in a factory?
Multiply the lost production value per hour by the number of hours each stoppage lasts, then by the number of stoppages per year. Add the emergency repair spend, expedited spare parts, scrapped work-in-progress and any penalty for a missed delivery. Most plants find the indirect costs are larger than the repair invoice itself.
What is a realistic hourly cost of downtime for a mid-size plant?
It depends on throughput value, not on plant size. A textile spinning hall may lose €1,500–€3,000 an hour, a pharmaceutical packing line €5,000–€15,000 an hour because of batch integrity rules, and a continuous process line far more because restart alone takes hours. Use your own output value per hour in the calculator above for a number you can defend internally.
How much downtime can condition monitoring realistically remove?
On rotating equipment — motors, pumps, compressors, gearboxes, fans — early warning from vibration, temperature and current signatures typically removes 30–40% of unplanned stoppages, because most of those failures develop over days or weeks rather than instantly. It does not remove downtime caused by material shortages, changeovers or planned maintenance.
What payback period should I expect?
If a single prevented major breakdown is worth more than the annual monitoring cost, payback is usually under twelve months. The calculator shows your payback in months so you can compare it against your own capital approval threshold before speaking to anyone.
Do I need to replace my machines or my existing systems?
No. The sensors attach to equipment already on your floor, including machines that are decades old, and run on their own gateway. Nothing has to be swapped out, and integration with an existing SCADA or maintenance system is optional rather than a prerequisite.
Want the numbers checked against your own asset list?